We recently installed a new sub-main at the Hovis factory in Stratford, South London. Feeding a new MCCB panel, the sub-main feeds a current area and allows future expansion and electrical works.
Part of the installation included 25 metres of industrial grade cable tray along the factory roof. 2 runs of 4 core 50mm steel wire armoured were required and our engineers are now weight lifting champions! Prior to the install we carried out a site survey to ensure business continuity and kept any power shutdown to a minimum. The job lasted around 2 weeks and included a mix of 9 till 5 and out of hours work.