We recently installed a new sub-main at the Hovis factory in Stratford, South London. Feeding a new MCCB panel, the sub-main feeds a current area and allows future expansion and electrical works.

The best cable tray install since sliced bread

Part of the installation included 25 metres of industrial grade cable tray along the factory roof. 2 runs of 4 core 50mm steel wire armoured were required and our engineers are now weight lifting champions! Prior to the install we carried out a site survey to ensure business continuity and kept any power shutdown to a minimum. The job lasted around 2 weeks and included a mix of 9 till 5 and out of hours work.